Tennant Creek Power Station - Unit 17 Generator

Working for Monadelphous, TopTroniX was engaged to commission Tennant Creek Power Station’s “Unit 17” gen-set. This gen-set was one of the two new “black-start” units to be commissioned, and had been installed years before hand but was never brought online.

We developed a detailed commissioning procedure that not only included the control system, but also the electrical interlocking & distribution network tests.

In the end, PowerWater ended up with a well commissioned gen-set available to come online at those times when it was needed the most!